Hydraulic Lift Preparation During Foundation Pier Installation
Hydraulic lifting equipment was used during the foundation pier installation process to carefully stabilize and support the settling foundation of this Pima, Arizona home.
Foundation Pier Excavation Along Settling Home
Excavation was completed along the home's foundation to provide access for foundation pier installation and long-term structural stabilization.
Foundation Prepared for Multiple Pier Installations
Several pier locations were excavated and prepared to address foundation settlement affecting multiple sections of the home.
Temporary Support System Inside Crawl Space
Temporary lifting equipment was installed beneath the floor system to prepare for SmartJack installation and structural reinforcement.
SmartJack Supports Installed Beneath Floor Framing
Adjustable SmartJack support columns and supplemental steel beams were installed beneath the home to stabilize sagging floor framing and improve structural performance.
Steel Beam Reinforcement with SmartJack Supports
A supplemental steel beam system works alongside SmartJack supports to provide long-term crawl space stabilization and floor support.
Completed SmartJack Crawl Space Stabilization Installation
The finished SmartJack system provides permanent support beneath the home and helps address floor sagging caused by weakened crawl space supports.
Pima Home Protected with Foundation and Crawl Space Repairs
Exterior view of the home after foundation pier installation and crawl space stabilization work was completed, providing comprehensive structural support.