Before & After

Cracked Concrete Repair in Mayer, AZ

Composite interlocking can be performed to tie the broken pieces of the concrete together. The existing crack will be cleaned, and non-parallel lines will be cut across the existing crack. Next carbon fiber laminate stitches will be inserted into the non-parallel cuts and then the gaps will be filled with a two-part poly. Finally, the crack should be ground smooth to minimize the differential. 

our service area

We serve the following areas

Our Locations:

Arizona Foundation Solutions
3125 S 52nd St
Tempe, AZ 85282
1-602-883-3777
Service Area
Free Estimate