Uneven Floors Before Foundation Repair
This photo shows the uneven flooring in this homeowner's cabin before foundation stabilization work began.
Concentric Pier Installation Along Home Exterior
The first concentric pier was installed beneath the home's perimeter beam to provide additional foundation support. After excavating the installation area, the pier was advanced into the soil and connected to the structure as part of the foundation stabilization project.
Concentric Piers Installed Along Foundation
A total of 9 concentric piers were placed at designated support locations to provide additional foundation support and help stabilize the structure.
SmartJack Installed Beneath Floor Beam
A SmartJack support system was installed in the crawl space beneath a floor beam. These adjustable steel supports provide additional reinforcement to the floor system and help strengthen areas affected by sagging or insufficient support.
SmartJacks Installed Throughout Crawl Space
Multiple SmartJacks were installed beneath the home's floor system to provide additional support for the crawl space structure. Positioned beneath a supplemental beam, these adjustable steel supports help reinforce floor framing and improve overall stability.