Concrete Lifting and Leveling - Intra-PolyLevel® Injection
In this step of the process, some holes got drilled all over the area to gradually and equally inject the PolyLevel® material. Once the PolyLevel® mix got prepared and injected, the material takes up to 15 minutes to fully expand and get solid.